A successful ITS solution must meet requirements on time and within a budget. To do this, transportation agencies must follow a coordinated integration process for implementing ITS.
Most ITS technologies are meant to integrate with an existing transportation system.
During the planning phase of integrating ITS, agencies will need to:
Once these variables are identified to create a comprehensive ITS architecture, the agencies can submit for funding.
When the local agency examines the current transportation challenges for a specific area, they will assess and identify different ITS projects. These projects can be:
All of these areas need to be addressed and defined for the ITS architecture:
For assessing costs, the Intelligent Transportation Systems Joint Program Office provides an ITS Costs Database for accurately determining capital, operational, and maintenance costs for implementing different ITS projects. Once budgets and expenses are determined, the agency can submit a Systems Engineering Review Form (SERF) for review and approval.
Do you need LED lighting for your wrong way signage? Contact BBRSS to learn more about their accessories.
Related Link: Roadway Industries
The agency should complete a Systems Engineering Management Plan (SEMP) and Systems Engineering process for each ITS project. When the final SEMP is approved, the agency can implement the ITS projects based on the architecture schedule.
If not already in place, a transportation operations center needs to be created. This agency will manage and respond to all transportation issues and problems that can’t be handled by the ITS hardware and applications.
The transportation operations center will manage:
ITS construction applies to physical devices or communication infrastructure that must be physically installed on the roadway. The regulations require state and local agencies to award contracts based on:
Once contracts have been awarded, the agency can manage and ensure project completion.
Because the US DOT has the right to access all documentation on federal-aid projects, strict record keeping is essential during ITS integration. Agencies must substantiate all costs.
During an ITS project, whenever the project adds, subtracts, or modifies elements, information flow, or interfaces, changes must be submitted to verify the ITS architecture. All implementation should be well documented and submitted for review and approval.
When an integration has followed procedure, the ITS projects should be able to:
While ITS seems like a reliable solution, there are some integration challenges to look out for when adopting new ITS technology:
Some ITS technology relies on communication with drivers using their cell phones or in-vehicle navigation systems, which becomes problematic when many cities and counties have banned cell phone use while driving. The ITS architecture will need an alternative plan for communication in these areas.
ITS technologies can improve the safety and efficiency of transportation when integrated in a sustainable, efficient manner. By following the ITS guidelines for integration, your ITS solution will enable better communication and traffic management.
BBRSS is the premier solutions provider of roadway managed lane products. We design, manufacture, and distribute roadway equipment that can be enabled with ITS technology.
Need help assessing your traffic management? Contact BBRSS to customize a roadway management system that meets your requirements and safety standards.
Related Link: Tollway Authorities